Section 8 – BBY 出货批准要求 Requirements for BBY Shipment Release
8.1首单产品出货放货条件 Shipment release conditions for first shipment PO#:
8.1.1BBY 出货前产品检验合格 BBY final random inspection for 1st PO# shipped product is passed
8.1.2按 BBY 要求的可靠性测试合格;Reliability testing by BBY requirements is passed;
8.1.3BBY 首件检验合格 BBY first article check is passed;
8.1.4生产制程管控流程经 BBY SQE 审核认可; Manufacture process quality control process is approved by BBY SQE;
8.1.5生产直通率及相关的质量数据达成 BBY SQE 与供应商设定的目标值;Production yield rate and related quality goal is aligned with BBY SQE; 8.1.6 提供前五项不良缺陷的原因分析及改善对策; Top 5 defect root cause analysis & solution is required to provided;
8.2BBY 返单产品出货放货条件 Shipment release conditions for BBY repeated orders;
8.2.1BBY 出货前产品检验合格; BBY final random inspection for shipped product is passed;
8.2.2按 BBY 要求的 ORT 可靠性测试合格;On-going reliability testing by BBY requirements is passed; 8.2.3 按 BBY 要求的电气性能参数测试合格;Performance parameter measurement by BBY requirements is passed;
8.2.4生产直通率数统计并达成 BBY SQE 与供应商设定的目标值; Production yield rate and related quality goal is aligned with BBY SQE;
8.2.5提供前五项不良缺陷的原因分析及改善对策;Top 5 defect root cause analysis & solution is required to provided;
8.3BBY 货品可以出厂的条件 Conditions for BBY Shipment Ex-factory:
8.3.1 BBY SQE 发行的出货放行通知邮件; Shipment approval notification is released by BBY SQE;
8.3.2 供应商内部出货流程必须经质量部门审批且有批准信函; Vendor must have approval notification for their internal shipment qualification by vendor’s quality department;