SECURITY REQUIREMENTS
Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability of thelocking mechanisms of the doors.
A seven- point inspection process is recommended for all containers:
Front wall
Left side
Right side
Floor
Ceiling/Roof
Inside/Outside doors
Outside/Undercarriage
Trailer Inspection: Procedures must be in place to verify the physical integrity of the trailer structure prior to stuffing, to include the reliability of the locking mechanisms of the doors. The following five- point inspection process is recommended for all trailers:
Personnel Security:
Supplier should conduct pre- employment screening and interviewing of prospective employees to include periodic background checks and application verifications.
Education and Training Awareness:
A security awareness program should be provided to employees including recognizing internal conspiracies, maintaining product integrity, anddetermining and addressing unauthorized access.
These programs should encourage active employee participation in security controls. Employees must be made aware of the procedures Supplier has in place to address a situation and how to report it.