咨询服务 培训服务
  肯达信服务热线 CTS 统一客服电话
400-690-0031
 
 
首页>咨询服务>COCA-COLA验厂咨询
COCA-COLA验厂咨询----可口可乐供应商指导原则(七)评估分级程序

Assessment Grading Process

评估分级程序



It is the auditor’s responsibility to determine if an applicable law has been violated, as well as to identify whether other SGP non-conformances have occurred that are not violations of law. Once the auditor(s) have determined that a non-conformance exists, they assign it to one of the following severity categories, which are described in more detail below:


Immediate Notification findings are findings that pose a significant risk to TCCC or any of its operations. These include any finding at the facility that could create a major concern, require production to be stopped immediately, or necessitate the initiation of marketplace actions. Immediate Notification findings also include any finding that could result in a major public relations issue or regulatory intervention that might threaten TCCC’s integrity or reputation, reduce or eliminate current or future sales, or reduce or eliminate the financial success of an operation.


Any time an Immediate Notification finding is identified, the facility may be de- authorized, depending on the severity of the finding(s). In other cases, the facility may be retained under the condition that corrective action is initiated immediately and completed before additional product is purchased from the facility. In any case, the service provider will communicate the finding immediately to Workplace Accountability (WA) and the business unit responsible for the assessment. WA will then notify the appropriate TCCC management.


Specific examples of Immediate Notification findings include operating without a legal business license, observed child labor, non payment of wages for more than one month, or health and safety findings that pose an imminent threat to workers and are likely to cause a fatality or serious injury.


Potential Risk findings include any medium impact finding that is in violation of local law, but is not considered an Immediate Notification finding. Although such findings are not considered Immediate Notification when viewed individually, they may present a critical risk to the operation when reviewed collectively. Potential Risk findings may require verification of corrective action through a follow up assessment. Corrective action should be a priority of the supplier and may be a condition of future purchases from the supplier.


Examples of Potential Risk findings include failure to produce adequate timecard records, payroll records, or other necessary documentation to demonstrate compliance with local laws; systemic minimum wage or overtime pay findings; blocked or locked emergency exits; failure to provide legally required protective equipment to workers; and denial of access to employees for interviews.


Improvement Opportunity findings are defined as any low impact finding (isolated or non systemic), which is not a structural shortcoming. Such findings may exist where the current system meets the TCCC requirements but an important opportunity exists for improvement. A number of improvement opportunities, when reviewed collectively, may present a potential risk to the operation.


Examples of Improvement Opportunity findings include expired labor contracts, unintentional payroll errors, unmarked emergency exits, or inadequate safety training. Upon receipt of a facility’s assessment report, Workplace Accountability calculates a numerical score based on the number and severity of violations discovered during the assessment. A facility’s score is the sum of all points received.

SA8000

SA8000. 社会责任管理体系认证咨询项目
点击查看

WAL-MART

WAL-MART. 沃尔玛客户验厂咨询项目
点击查看

ISO20000认证咨询

ISO20000. IT服务管理体系国际标准认证咨询介绍
点击查看
客服中心
杨老师
王老师
徐老师
郭小姐
张小姐
陈老师
您好,我是肯达信管理顾问公司客服,欢迎咨询!

杨老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

王老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

徐老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

郭小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

张小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

陈小姐


客户服务热线

400-690-0031

24小时热线

18576401396


展开客服